Pricing & quotations

Transparent scope before price.

Engineering costs depend on load, site conditions, equipment specification, compliance requirements and installation complexity. We therefore quote against a defined technical scope rather than publish unreliable fixed material prices.

How quotation works

A practical four-step process.

1

Tell us the need

Share the service, drawings, load profile, location or problem statement.

2

Technical review

We confirm scope, constraints, standards and whether a site survey is required.

3

Costed proposal

A quotation is aligned to equipment, materials, labour, logistics and project controls.

4

Delivery plan

After approval, execution is planned around schedule, safety, quality and commissioning.

Solar & backup power

Pricing is driven by verified daily energy, peak load, autonomy, PV-array size, battery chemistry, inverter rating, mounting, protection and installation conditions.

Start with preliminary sizing →

Electrical & automation

Pricing depends on design scope, voltage level, cable routes, switchgear, control architecture, instrumentation, civil requirements, testing and commissioning.

Request electrical quote →

Mechanical & water

Pumps, pipelines, tanks, boreholes, HVAC and plant installations are costed from duty requirements, materials, layout, interfaces and site constraints.

Request mechanical quote →
Request a quotation

Send enough information for a useful first response.

Include the site location, required completion date, drawings/photos where available, and any known load or capacity requirements.

Request quotation